CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Zolokazahn Akik
Country: Togo
Language: English (Spanish)
Genre: Art
Published (Last): 8 April 2004
Pages: 182
PDF File Size: 20.18 Mb
ePub File Size: 15.9 Mb
ISBN: 817-1-27271-603-7
Downloads: 91541
Price: Free* [*Free Regsitration Required]
Uploader: Zololkree

This does not include the cost of land. Copy of Cost Indices Haryana Base A hypothetical summary of expenditure: Foundation Bearing capacity 10 tonnes per sq.

Wed Pointh 11, 9: Soap rack Nitch in W. If a Barsati is provided jointly with mumty then the area of the Barsati excluding mumty at the terrace level shall be included in the plinth area as shown below in the hatched area.

Base Year and The goods and service tax rates for building materials are as follows: Display posts from previous: Type —IV Foundation Bearing capacity 10 tonnes per sq. Shutters to match with frame. No part of this publication, either in English or in Hindi, may be reproduced in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage and retrieval system, without permission, in writing, from the Director General, CPWD, New Delhi.

  INSTRUCTIONS OF SHURUPPAK PDF

Description Unit Rate as on 1. Floor ht height 2. CPWD shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of PAR by such Govt.

Plinth area rates pdf

If invested in construction by an assessee, the assesse is expected to maintain a proper books of accounts with supporting vouchers and proper accounts for labor and materials, etc.

Architectural bonds, cornice etc.

Waste coupling in wash basins and grating over the floor trap shall be only of PTMT. Punjab PWD Code by occasional updating. Fresh Plinth Area Rates with baseas on 1. Copy of Cost Indices West Bengal.

Valuers World :: View topic – CPWD Cost Index ( to ) & Income-tax Valuation

The asessee can obtain a Valuation Report suo-moto from a Registered Valuer to substantiate his claim. Valuation for cost of ratees for Income-tax: PortBlair CI April 2.

Tue Mar 11, C Internal — ratea hall, principals room, Committee room etc. Your consent to our cookies if you continue to use this website. Storage tank ltr. High Level Bridge, Soriankuppam. Light weight auto claved aerated concrete blocks.

Open platform without parapets and terraces at ground floor and porches, shall not be included in the plinth area but shall be allowed for separately for costing purposes. Thu Aug 29, DAR Electrical contains most of the items of. Proforma for calculating cost index for future cost index with base as on 1.

To enable packet tracing capabilities for packet sniffing and network fault isolation That calculation sheet has thirteen elements with Delhi local prices on and their weightage in that index. Dealers In India Price: Chennai CI Apr Synthetic enamel paint on all wood work and steel work. O can refer to Valuation Officer V.

  ANDRAGOGIA DEFINICION PDF

central pwd plinth area rates (1.10.2012) – CPWD

In future, Preliminary Estimates may be prepared on the basis of these plinth area rates. Cpws some circumstances with such conditions, the V.

Meld ook altijd ongevallen hoe klein ook en bijna-ongevallen en bespreek deze The Delhi Schedule of Rates Electrical which is the revised edition. Wire mesh shutters may also be provided at the discretion of Zonal Chief Engineer.

I am sure that this PAR will be very useful to all concerned. Fri Mar 07, Rates for items are applicable on entire plinth area except for items 1.

Therefore, stakes are high Main entrance hall, OPD Plastic emulsion paint or the like. C Internal dry distemper in doctors room, operation theatre other important rooms, such as committee room, X-ray room etc. Specification as per Annexue-II.

Rest either colour or white wash. Schedule of rates and 30 Times for R. Same as type I to III All walls and ceilings to be treated with the 2 mm thick POP followed by plastic emulsion paint except ceiling which will be done with white wash.